111
4101676605640_.pic

The 100MW solar thermal project in the Haixi base of the third bid section of the second phase of Qingyu DC Project

Project Details:
Contract signed in 2023
Cold salt pump 3 sets
Hot salt pump 2 sets
Globe valve 12 sets
Control valve 10 sets
Butterfly valve 8 sets

You Might Also Like

Leave a Reply

Your email address will not be published. Required fields are marked *

Call me back
[contact-form-7 id="2108" title="Call me back"]